If you carry out electrical installation work in Andhra Pradesh, whether it is building wiring in Vijayawada, a solar park connection in Anantapur, or a 33 KV industrial line near Visakhapatnam, you need a valid Electrical Contractor Licence issued by the A.P. Electrical Licensing Board. Working without one is not a paperwork lapse. DISCOMs cannot legally energise an installation unless a licensed contractor certifies it, so an unlicensed contractor is locked out of both private projects and government tenders.
The rules governing this licence changed in March 2025, and most information available online still describes the repealed 1987 system. This guide is prepared by the Tender & Licence team directly from the Andhra Pradesh Electrical Licensing Rules, 2025 as notified in the official gazette, along with the actual APELB application forms and licence formats, so the fees, timelines and conditions below reflect what the Board actually applies today.

The Electrical Contractor Licence (also searched as electrical contractor license) is the statutory authorisation that permits a person or firm to undertake electrical installation works in the state. It is issued by the Andhra Pradesh Electrical Licensing Board under the Andhra Pradesh Electrical Licensing Rules, 2025, notified through G.O.Ms.No.27, Energy (Power.II) Department, dated 6 March 2025. These rules were framed under Section 180(2)(o) of the Electricity Act, 2003 and Regulation 31 of the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023, and they replace the Andhra Pradesh Electrical Licensing Regulations, 1987 that governed the field for nearly four decades.
The practical force behind the licence sits in one rule: no electricity supplier can connect supply to any new installation, addition or alteration unless a Licensed Electrical Contractor’s completion-cum-test report in Form WR-2 is produced. In other words, every wiring job, panel installation, substation erection or line work in Andhra Pradesh ultimately needs a licensed contractor’s signature before power flows. That applies to work for APEPDCL, APCPDCL and APSPDCL consumers, APTRANSCO contracts, government department tenders, industrial units and private builders alike.
The licence is granted by the A.P. Electrical Licensing Board (APELB), which functions under the office of the Director of Electrical Safety and Chief Electrical Inspector to Government of Andhra Pradesh. The Director of Electrical Safety and CEIG is the ex-officio Chairman of the Board, and the Electrical Inspector, Guntur is the ex-officio Secretary. All contractor licence applications, renewals and correspondence go to the Secretary at Guntur, and every licence carries the Secretary’s signature and the Board’s seal.
One honest caveat before you plan your application. Unlike states such as Uttar Pradesh where contractor licensing runs through an online portal, the Andhra Pradesh contractor licence process is still a physical, challan-based process. Application forms can be downloaded from the CEIG Andhra Pradesh website (apceig.in), but the filled application, original permit books, treasury challan and enclosures are submitted as a physical file to the Secretary, APELB, Guntur. Only the supervisor and wireman competency examinations are handled online, through the State Board of Technical Education and Training (SBTET AP). Anyone promising a fully online contractor licence for AP is describing a process that does not exist yet.
The 2025 Rules keep the broad structure of the old regime but tighten several points that matter to working contractors:
Licences and permits issued under the 1987 Regulations remain valid under the savings clause, so existing contractors do not need to reapply. They simply renew under the new rules when their current validity ends.
Andhra Pradesh issues two grades of electrical contractor licence.
Grade A Electrical Contractor Licence is issued in Form HA and covers extra high voltage, high voltage, medium voltage and low voltage electrical installation works. The voltage level you can actually work on depends on the strength of your supervisor's permit, and the licence is endorsed accordingly. On real APELB licences you will see endorsements such as "Up to 11 KV only", "Up to 33 KV only" or "Exceeding 33 KV (All Voltages)". The recognised voltage slabs are:
Grade B Electrical Contractor Licence is issued in Form HB and covers low and medium voltage installations with a connected load ceiling:
In plain terms: house wiring, shops and small commercial loads can run on Grade B, while DISCOM line works, substations, industrial HT connections, solar plants and almost all government electrical tenders require Grade A with the matching voltage endorsement. If you intend to bid APTRANSCO or DISCOM works, check the voltage class specified in the tender before applying, because upgrading the voltage level later is a separate application with its own fee.
The applicant, whether an individual, partnership firm or company, must employ:
If the applicant personally holds a Supervisor’s Competency Certificate and appropriate permit, there is no need to employ a separate supervisor. In a partnership firm, one of the partners may hold the certificate and permit instead. This is exactly how many proprietor-led firms in Guntur, Kurnool and Anantapur structure their licence.
Three conditions trip up applicants regularly, so read these carefully:
The applicant must employ one wireman holding a certificate of competency and permit. If the applicant himself is a wireman or Supervisor (Grade 3 or 4) permit holder, no separate employee is needed. The same full-time employmentand non-dual-employment conditions apply.
The Board verifies your instrument list before granting the licence, and the instruments must carry valid test certificates. For Grade A, depending on your voltage class, you need:
For Grade B, the list is shorter: a live line tester, standard wire gauge, 500 V insulation testing megger and a tong tester.
Instrument testing itself is a small sub-process. You submit a request letter to the Deputy Electrical Inspector of your sub-division along with a paid challan, listing each instrument with its maker’s name, serial number and range. The Inspectorate tests the instruments and issues the test certificates that go into your licence file. Under Rule 41, the instruments must stay in good working condition throughout the licence period and be produced whenever the Secretary demands them for testing and checking, so this is not a one-time formality.
The application for both grades is made in Form J to the Secretary, APELB. A complete Grade A file typically contains:
The fee schedule under the 2025 Rules is:
| Purpose | Grade A | Grade B |
|---|---|---|
| Initial licence fee | Rs. 1,000 | Rs. 200 |
| Renewal fee | Rs. 600 | Rs. 150 |
| Duplicate licence | Rs. 200 | Rs. 75 |
| Change of name | Rs. 200 | Rs. 75 |
| Transfer of licence to successor | Rs. 200 | Rs. 75 |
| Late fee for renewal during grace period | Rs. 150 | Rs. 50 |
| Change in voltage or load level | Rs. 500 | Rs. 100 |
| Cost of application form | Rs. 50 | Rs. 30 |
| Continuing the same licence number for a lapsed licence | Rs. 1,000 | Rs. 1,000 |
Related permit fees: grant of competency certificate and permit costs Rs. 150 for supervisors and Rs. 60 for wiremen, and permit renewal costs Rs. 125 and Rs. 50 respectively. Fees are paid by challan into the prescribed government head of account and the original challan is enclosed with the application. Confirm the current head of account with the Inspectorate before remitting, because a challan credited to the wrong head is the single most common reason files bounce.
The 2025 Rules do not prescribe a statutory processing timeline. In practice, a documents-complete file moves through in roughly four to twelve weeks depending on verification and the Board’s internal schedule, while files with permit discrepancies or missing test certificates can sit for months. The Tender & Licence team’s standard approach is to resolve every permit validity and instrument issue before filing, precisely because post-submission clarifications are slow in a physical-file system.
Every electrical contractor licence in Andhra Pradesh is valid for two years and renewed once in two years. The renewal application is made in Form N and must be submitted within the 90 days before the expiry date, enclosing:
If you miss the expiry date, the rules allow renewal up to 90 days after expiry on payment of the late fee (Rs. 150 for Grade A, Rs. 50 for Grade B). Beyond that 90-day grace period, the licence stands cancelled and a fresh licence has to be obtained. The one softener is that the Board permits continuing your old licence number on a lapsed licence against a fee of Rs. 1,000, which matters if your licence number is quoted in running contracts and DISCOM registrations.
Rule 38 is printed as a warning note on the face of every AP licence, and for good reason. Your licence is deemed suspended forthwith if:
From the date of such suspension you get one month to employ a replacement permit holder or get the lapsed permit renewed. If that does not happen within the month, the licence stands cancelled. A contractor’s licence issued to a partnership firm also stands cancelled immediately on any change in the partnership, and the licence is not transferable, except that on the death of a proprietor or partner the legal successor can have it altered within six months on producing a succession certificate, with the death intimated to the Secretary within one month.
The practical discipline this demands is simple: maintain a diary of every permit expiry date on your licence and start permit renewals early. A large share of the emergency cases that reach Tender & Licence are contractors whose wireman’s permit quietly expired mid-tenure, which suspended a perfectly good licence in the middle of running DISCOM works.
Since the whole licence rests on permits, here is the current framework in brief. The supervisor examination is conducted by the State Board of Technical Education and Training, AP on behalf of the Director of Electrical Safety and CEIG, with written papers plus practical and oral components, and applications are made online through the SBTET portal when notifications open.
For wiremen, the examination is practical plus oral, eligibility is 4 years of certified experience with a minimum age of 18, and candidates who have passed a recognised ITI wireman or electrician trade examination with one year of experience are exempted. Wireman permits follow the same 5-year validity cycle, with a late fee of Rs. 50 per year during grace.
Supervisor certificates and permits issued by other states can be recognised in AP under reciprocal arrangements on payment of a Rs. 300 recognition fee, with the recognition endorsement made on the permit.
The licence brings continuing obligations that inspectors actually check:
The demand map for licensed contractors in AP is broad. Visakhapatnam anchors heavy industry, port infrastructure and IT campuses on the east coast, with APEPDCL network works running through the district. The Vijayawada and Guntur belt, together with the Amaravati capital region construction programme, generates continuous building services and HT connection work under APCPDCL. Tirupati and Sri City host one of south India’s fastest growing electronics manufacturing clusters, served by APSPDCL, while Kakinada and Nellore (Krishnapatnam) add port-led industrial loads. Kurnool and Anantapur sit at the centre of the state’s solar and wind park corridor, where developers routinely require Grade A contractors with 33 KV and above endorsements. Rajahmundry, Eluru, Ongole, Vizianagaramand Chittoor round out steady municipal, housing and MSME wiring demand. Whichever region you operate in, the licence and its voltage endorsement decide which of these opportunities you can legally bid.
Tender & Licence assists electrical contractors across India with state licensing, and our Andhra Pradesh service covers the complete APELB cycle:
To be transparent about scope: we do not appear in or clear SBTET competency examinations on anyone’s behalf, we do not supply supervisors or wiremen as manpower, and we cannot revive a licence that has crossed the 90-day grace period, in which case we prepare the fresh application honestly rather than promising a shortcut. If your supervisor or wireman permits are the weak link, we tell you that before you spend money on the contractor licence file.
We already support contractors with electrical contractor licences in Uttar Pradesh, Delhi, Maharashtra and Gujarat, along with allied requirements such as GeM registration, tender documentation and ISO certification, so multi-state contractors get one coordinated compliance desk. If you are planning an Andhra Pradesh electrical contractor licence application, renewal or a voltage upgrade, reach out to the Tender & Licence team and we will map your fastest compliant route.
Prepare the application in Form J with your supervisor and wireman permit details, instrument test certificates, fee challan and declarations, and submit the physical file to the Secretary, A.P. Electrical Licensing Board, Guntur. Forms are available on the CEIG AP website, but there is no online application for the contractor licence itself.
Under the 2025 Rules, the initial fee is Rs. 1,000 for Grade A and Rs. 200 for Grade B, paid by treasury challan. Renewal costs Rs. 600 and Rs. 150 respectively.
The licence is valid for two years. Renewal is filed in Form N within the 90 days before expiry, with the expiring licence, employee declarations, challan, employee register and instrument declaration.
Grade A covers low to extra high voltage works depending on the supervisor permit strength and is required for HT, substation, DISCOM and most government works. Grade B covers low and medium voltage installations with connected load limits of 50 HP or 75 HP, or without load limit if a supervisor is employed.
No. As of now the contractor licence is a physical, challan-based application at APELB Guntur. Only the SBTETsupervisor and wireman examinations are applied for online.
Yes for Grade A. Every applicant or holder must have an office in the state, and all Board correspondence is made only to that office.
The licence is deemed suspended immediately. You have one month to employ a replacement permit holder or renew the lapsed permit, failing which the licence stands cancelled.
No. The grace period for renewal with late fee is 90 days after expiry. Beyond that the licence stands cancelled and a fresh licence must be obtained, though the Board allows retaining the old licence number on payment of Rs. 1,000.
Yes. The 2025 Rules contain a savings clause, so licences and permits issued under the 1987 Regulations continue to be valid and are simply renewed under the new rules.
Only where a reciprocal arrangement exists between AP and that state. Recognition is endorsed on the permit on payment of a Rs. 300 fee, and the holder becomes subject to the AP rules.